Waste transfer notes
Every collected skip needs a waste transfer note. Skip Technology pre-fills the WTN from the job — EWC code, your carrier licence, the customer's details and the tip's permit — and produces a signed-ready branded PDF you can print or email.
The legal bit
Keep every note for two years — yours are stored forever, searchable by customer, job or date.
FAQ
The Duty of Care record required under section 34 of the Environmental Protection Act 1990 whenever non-hazardous waste changes hands — e.g. when you collect a skip. It records what the waste is (EWC code), who transferred and received it, and where it's going. Both parties keep it for two years.
Most mixed construction skips are 17 09 04 (mixed C&D waste). Household clearances are typically 20 03 01, inert concrete/brick loads 17 01 07, and soil 17 05 04. Skip Technology has the common codes built in.
Yes. Defra's Digital Waste Tracking Service covers the receipt of waste at permitted sites from 1 October 2026. The Duty of Care transfer note between producer and carrier is still required — they run side by side.
WTNs, invoices and Defra waste tracking — all from the same job record.